Tuesday 06:40 | rain band expected after 09:00 | supervisor: Lena Ortiz

Normal Monitoring Needs follow-up Critical

Route coverage

73%

meter reads complete

Open work orders

18

11 scheduled, 7 pending parts

Calls waiting

5

average wait 4 min

Critical timer

14

minutes before manual check target

Hydraulics

North basin level

Holding at 61%. Gate trim changed by 2 cm at 06:10.

owner: Control room | next read: 07:15

Pump Station 9 telemetry silent

Last heartbeat 05:52. Dispatch manual check before 08:30 if signal does not return.

owner: Crew B | next action: call in 14 min

Reservoir chlorine residual

Sample at Pier 4 returned 1.2 mg/L. No adjustment requested.

owner: Lab | next read: 10:00

Field Crews

Crew A: inlet screens

Clear leaves from South Park inlets before the rain band reaches downtown.

truck 12 | eta: 07:20

Crew B: pressure complaint route

Check three addresses on Mariner Street after school drop-off clears.

truck 18 | eta: 08:05

Crew C: valve box photos

Upload missing before/after images from yesterday's repair package.

truck 9 | due: noon

Customer Desk

Backflow notices

Send second reminder to 41 accounts that missed the June test window.

owner: Nia | batch: ready

Marina hydrant inquiry

Contractor requested flow history for the fire marshal packet.

owner: Eli | due: today

Handoff Notes

  • Storm drains west of Civic High were swept yesterday.
  • Generator test at Plant 2 slipped to 13:00.
  • If Pump Station 9 stays silent, log a field safety check before dispatch.